What is the development process?

We offer a free-of-charge initial assessment for all heat pump projects, to provide details of the expected performance and project finances.

After that, we will carry out a site survey to review the heating demand, emitter specifications and suitability of the watercourse.

Smaller projects (<100kW) typically take 4-5 months, including: 1. Site survey and EN12831 heat loss calculations 2. Detailed design (+ consenting if required) 3. Installation & commissioning Larger projects (>100kW) typically take 7-9 months, including:
1. Site survey
2. Feasibility study
3. Detailed design & consenting
4. Installation & commissioning

Renewables First offers a ‘turnkey’ solution from start to finish. Our scope includes the heat pump, heat collectors, and the pipework between the two. We will advise your heating engineer to ensure that the internal heating and hot water systems work seamlessly with the heat pump.

Are you considering a water source heat pump project ?

Renewables First have considerable experience and full project capability, from initial feasibility study through to system design and installation.

The first step to develop a water source heat pump project is to conduct a Free Initial Heat Pump Assessment.

Contact us about a free initial assessment today!

Once complete, you will understand the site potential and be guided through the next steps to develop your project.