The Norvento nED100 100 kW Wind Turbine
What is the Norvento nED 100 most suitable for?
The Norvento nED-100 100kW Wind Turbine is available in two rotor sizes, 22m and 24m diameter and is suitable for :
- Modestly windy sites
- Limited grid capacity sites or high grid costs
- Sites where noise is an issue
- Small / Medium sites
- On-site generation
- Factories
- Seaports
- Shopping Centres
- Leisure Centres
- Farms
- Schools
- Hospitals
- Government and Institutional Buildings
- Community
- Commercial and industrial sites
nED-100 100 kW Specification
Turbine | |
---|---|
Configuration | Three blade, horizontal axis, upwind |
Rated Power | 100kW at 10m/s |
Rotor Speed | 33 to 67 rpm |
IEC 61400-1 Turbine Class | IIIA |
Site Average Wind Speed | 7.5 m/s |
Survival Wind Speed | 52.5 m/s or 117 mph |
Rotor | |
Rotor Diameter | 22 m / 24 m |
Swept Area | 380 m² / 452 m² |
Blade Material | Fibreglass and epoxy resin |
Power regulation | Full blade variable pitch |
Generator | |
Generator Type | Permanent Magnet Synchronous Generator (Direct Drive) |
Configuration | 3-Phase, 400 VAC, 50 Hz |
Brake & Safety System | |
Main Brake System | Two electromechanical brakes operating in parallel |
Automatic Shutdown triggered by | High wind speed, grid failure, over-speed, all other fault conditions |
Controls | |
Control Systems User Interface | Programmable Logic Controller (PLC) |
nED Scada Control Centre | |
Towers | |
Available Hub Heights | 24.5 m, 29.5 m, 26.0 m |
Tower Type | Multi-sections tubular steel tower |
Warranty | |
Period and type | Standard – 5 year parts and labour optional: |
Download Data Sheet Here |
Are you considering a wind turbine project?
Renewables First are an experienced wind consultant and have a full project capability, from initial feasibility study through to wind consenting and installation.
The first step to develop any wind power site is to conduct a full Wind Turbine Feasibility Study.
If you are interested in installing a wind turbine, the first step is to Contact us to discuss your requirements and to complete a Wind Turbine Feasibility Study.